{"id":411272,"date":"2024-10-20T05:44:24","date_gmt":"2024-10-20T05:44:24","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-19659-32022\/"},"modified":"2024-10-26T10:36:23","modified_gmt":"2024-10-26T10:36:23","slug":"bs-iso-19659-32022","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-19659-32022\/","title":{"rendered":"BS ISO 19659-3:2022"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
2<\/td>\nundefined <\/td>\n<\/tr>\n
6<\/td>\nForeword <\/td>\n<\/tr>\n
7<\/td>\nIntroduction <\/td>\n<\/tr>\n
9<\/td>\n1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
3.1 Terms and definitions
3.2 Abbreviated terms <\/td>\n<\/tr>\n
10<\/td>\n4 Train mode
4.1 General
4.2 Train in-service mode (TISM)
4.3 Train ready for service mode (TRSM)
4.4 Pre-conditioning mode (PCM)
4.5 Parking mode (PM) <\/td>\n<\/tr>\n
11<\/td>\n4.6 Operating timetable, hours for each mode and category
5 Principles
5.1 General <\/td>\n<\/tr>\n
12<\/td>\n5.2 Methods
5.2.1 General
5.2.2 Method I [with climatic facility \/ ISO 19659-2]
5.2.3 Method II [without climatic facility]
5.3 Climatic and operational boundary conditions
5.3.1 General
5.3.2 Operational point matrix <\/td>\n<\/tr>\n
14<\/td>\n5.3.3 Weather data analysis <\/td>\n<\/tr>\n
16<\/td>\n6 Assessment methods
6.1 General
6.2 Simulation and calculation
6.2.1 Simulation
6.2.2 Calculation of the total annual energy consumption <\/td>\n<\/tr>\n
17<\/td>\n6.2.3 Calculation of the total annual energy efficiency <\/td>\n<\/tr>\n
18<\/td>\n6.2.4 Documentation
6.3 Verification
6.3.1 General
6.3.2 Test rules <\/td>\n<\/tr>\n
19<\/td>\n6.3.3 Documentation
6.4 Post-processing <\/td>\n<\/tr>\n
22<\/td>\nAnnex A (informative) Procedure for decision of operational point matrix <\/td>\n<\/tr>\n
25<\/td>\nAnnex B (informative) Procedure for weather data analysis <\/td>\n<\/tr>\n
32<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Railway applications. Heating, ventilation and air conditioning systems for rolling stock – Energy efficiency<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2022<\/td>\n36<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":411279,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[775,2641],"product_tag":[],"class_list":{"0":"post-411272","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-45-060-01","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/411272","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/411279"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=411272"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=411272"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=411272"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}