{"id":395171,"date":"2024-10-20T04:17:38","date_gmt":"2024-10-20T04:17:38","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iec-62037-52021-tc\/"},"modified":"2024-10-26T08:03:05","modified_gmt":"2024-10-26T08:03:05","slug":"bs-en-iec-62037-52021-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iec-62037-52021-tc\/","title":{"rendered":"BS EN IEC 62037-5:2021 – TC"},"content":{"rendered":"
This part of IEC 62037 defines test fixtures and procedures recommended for measuring levels of passive intermodulation generated by filters, typically used in wireless communication systems. The purpose is to define qualification and acceptance test methods for filters for use in low intermodulation (low IM) applications.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | 30453471 <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | A-30409223 <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Annex ZA (normative)Normative references to international publicationswith their corresponding European publications <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | English CONTENTS <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 1 Scope 2 Normative references 3 Terms, definitions and abbreviated terms 3.1 Terms and definitions 3.2 Abbreviated terms <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 4 General comments on PIM testing of filter assemblies 4.1 Sources of error: back-to-back filters 4.2 Environmental and dynamic PIM testing Figure 1 \u2013 Typical receive band PIM test set-up <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 4.3 General test procedure Figure 2 \u2013 Example of a striking element for \u2264 1 J <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 5 Example of test equipment schematics for filter testing 5.1 General 5.2 Transmit band testing Table 1 \u2013 Summary table referencing examples of test equipmentschematics for measuring PIM on filter-type devices <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 5.3 Receive band testing \u2013 Dual high-power carriers Figure 3 \u2013 Typical test equipment schematic for measuring transmit-band, forward, passive IM products on an N-port DUT using two high-power carriers <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | Figure 4 \u2013 Typical test equipment schematic for measuring receive-band, forward, passive IM products on an N-port DUT, using two high-power carriers Figure 5 \u2013 Typical test equipment schematic for measuring receive-band, reverse, passive IM products on an N-port DUT, using two high-power carriers <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 5.4 Receive band testing \u2013 Injected interferer Figure 6 \u2013 Typical test equipment schematic for measuring receive-band,passive IM products on an N-port DUT, using two high-power carriers <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | Figure 7 \u2013 Typical test equipment schematic for measuring receive-band, forward, passive IM products on an N-port DUT, using the injected interferer technique Figure 8 \u2013 Typical test equipment schematic for measuring receive-band, reverse, passive IM products on an N-port DUT, using the injected interferer technique <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | Figure 9 \u2013 Typical test equipment schematic for measuring receive-band, passive IM products on an N-port DUT, using the injected interferer technique <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tracked Changes. Passive RF and microwave devices, intermodulation level measurement – Measurement of passive intermodulation in filters<\/b><\/p>\n |