{"id":359565,"date":"2024-10-20T01:26:48","date_gmt":"2024-10-20T01:26:48","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-iec-218362020\/"},"modified":"2024-10-26T02:09:09","modified_gmt":"2024-10-26T02:09:09","slug":"bs-iso-iec-218362020","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-iec-218362020\/","title":{"rendered":"BS ISO\/IEC 21836:2020"},"content":{"rendered":"

This document specifies a measurement method to assess and report the energy effectiveness of a computer server. This document does not set any pass\/fail criteria for servers.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
2<\/td>\nNational foreword <\/td>\n<\/tr>\n
7<\/td>\nForeword <\/td>\n<\/tr>\n
8<\/td>\nIntroduction <\/td>\n<\/tr>\n
9<\/td>\n1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
3.1 Terms and definitions <\/td>\n<\/tr>\n
17<\/td>\n3.2 Abbreviated terms <\/td>\n<\/tr>\n
18<\/td>\n4 Applicability of Server Energy Effectiveness Metric (SEEM)
4.1 General
4.2 Applicability of SERTv2 <\/td>\n<\/tr>\n
19<\/td>\n4.3 Determination of applicability for an \u201cimplementer-specified\u201d metric
5 Determination of Server Energy Effectiveness Metric (SEEM)
5.1 General
5.2 Power supply requirements <\/td>\n<\/tr>\n
20<\/td>\n5.3 SERTv2 active state energy effectiveness metric <\/td>\n<\/tr>\n
22<\/td>\n5.4 Determination of \u201cimplementer-specified\u201d metrics
5.4.1 General
5.4.2 \u201cImplementer-specified\u201d active state metrics <\/td>\n<\/tr>\n
23<\/td>\n5.4.3 \u201cImplementer-specified\u201d idle state metric <\/td>\n<\/tr>\n
24<\/td>\n6 SEEM implementation
6.1 General
6.2 Implementation steps for SEEM
6.3 Implementation steps for SERTv2
6.4 Implementation steps for \u201cimplementer-specified\u201d metrics <\/td>\n<\/tr>\n
25<\/td>\n6.5 Threshold selection
7 Server testing
7.1 Configuration <\/td>\n<\/tr>\n
26<\/td>\n7.2 Environment
7.3 Power analyser calibration requirement
7.4 Power requirements
7.5 SEEM idle state power test method <\/td>\n<\/tr>\n
27<\/td>\n7.6 Testing Variance
7.6.1 General <\/td>\n<\/tr>\n
28<\/td>\n7.6.2 Software Testing Variance Specification
7.6.3 SEEM Hardware Testing Variance Specification
7.7 Technical support
7.7.1 Technical support requirements
7.7.2 SPEC SERTv2 technical support <\/td>\n<\/tr>\n
29<\/td>\n7.8 Server product family and special configuration testing
7.8.1 General <\/td>\n<\/tr>\n
30<\/td>\n7.8.2 Single configuration testing
7.8.3 SERTv2 product family and special configurations <\/td>\n<\/tr>\n
32<\/td>\n7.8.4 Product family and special configurations for \u201cimplementer-specified\u201d metrics
7.9 \u201cImplementer-specified\u201d metric creation testing
7.9.1 General
7.9.2 Functionality and reproducibility testing <\/td>\n<\/tr>\n
34<\/td>\n7.9.3 Real-world energy savings testing
8 Reporting SEEM
8.1 Server categories
8.1.1 General
8.1.2 SERTv2 server category definitions <\/td>\n<\/tr>\n
37<\/td>\n8.1.3 \u201cImplementer-specified\u201d metric server categories
8.2 Documentation
8.2.1 General
8.2.2 Implementation documentation <\/td>\n<\/tr>\n
38<\/td>\n8.2.3 SEEM end user documentation <\/td>\n<\/tr>\n
41<\/td>\n9 Minor update acceptance testing
9.1 General
9.2 SEEM minor update testing and requirements
9.2.1 SEEM component versions
9.2.2 Power analysers <\/td>\n<\/tr>\n
43<\/td>\n9.2.3 Temperature sensors
9.3 SERTv2 minor update testing and requirements
9.3.1 General <\/td>\n<\/tr>\n
44<\/td>\n9.3.2 SERTv2 Component versions
9.3.3 SERTv2
9.3.4 PTDaemon <\/td>\n<\/tr>\n
45<\/td>\n9.3.5 SERTv2 Client Configuration XML <\/td>\n<\/tr>\n
53<\/td>\n9.4 \u201cImplementer-specified\u201d metric minor update requirements <\/td>\n<\/tr>\n
54<\/td>\nAnnex A (normative) SERTv2 pre-approved CPU architectures, operating systems, and Java Virtual Machines (JVMs) <\/td>\n<\/tr>\n
65<\/td>\nAnnex B (normative) SEEM pre-approved power analysers and temperature sensors <\/td>\n<\/tr>\n
67<\/td>\nAnnex C (normative) SERTv2 required documentation fields <\/td>\n<\/tr>\n
69<\/td>\nAnnex D (normative) Deployed power assessment <\/td>\n<\/tr>\n
77<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Information technology. Data centres. Server energy effectiveness metric<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2020<\/td>\n80<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":359577,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-359565","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/359565","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/359577"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=359565"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=359565"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=359565"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}