{"id":313232,"date":"2024-10-19T21:33:33","date_gmt":"2024-10-19T21:33:33","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iso-11298-12018-tc\/"},"modified":"2024-10-25T19:37:53","modified_gmt":"2024-10-25T19:37:53","slug":"bs-en-iso-11298-12018-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iso-11298-12018-tc\/","title":{"rendered":"BS EN ISO 11298-1:2018 – TC"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
32<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | European foreword <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 4 Symbols and abbreviated terms 4.1 Symbols 4.2 Abbreviated terms <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 5 Pipes at the \u201cM\u201d stage 5.1 Materials 5.2 General characteristics 5.3 Material characteristics 5.4 Geometric characteristics 5.5 Mechanical characteristics 5.6 Physical characteristics 5.7 Jointing 5.8 Marking <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | 6 Fittings at the \u201cM\u201d stage 6.1 Materials 6.2 General characteristics 6.3 Material characteristics 6.4 Geometric characteristics 6.5 Mechanical characteristics 6.6 Physical characteristics 6.7 Jointing 6.8 Marking <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 7 Ancillary components 8 Fitness for purpose of the installed lining system at the \u201cI\u201d stage 8.1 Materials 8.2 General characteristics <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 8.3 Material characteristics 8.3.1 Effect on water quality 8.3.2 Sealing rings 8.4 Geometric characteristics 8.5 Mechanical characteristics <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 8.6 Physical characteristics 8.7 Additional characteristics 8.8 Sampling 8.9 Regional requirements for the installed lining system 9 Installation practice 9.1 Preparatory work 9.2 Storage, handling and transport of pipes and fittings 9.3 Equipment 9.3.1 General 9.3.2 Inspection equipment 9.3.3 Lifting equipment <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | 9.4 Installation 9.4.1 General 9.4.2 Safety precautions 9.4.3 Simulated installations 9.5 Process-related inspection and testing <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | 9.6 Lining termination 9.7 Reconnection to the existing pipeline system 9.8 Final inspection and testing 9.9 Documentation <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tracked Changes. Plastics piping systems for renovation of underground water supply networks – General<\/b><\/p>\n |