{"id":234610,"date":"2024-10-19T15:18:00","date_gmt":"2024-10-19T15:18:00","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asce-book-pipelines-settingthevision-2020\/"},"modified":"2024-10-25T09:51:28","modified_gmt":"2024-10-25T09:51:28","slug":"asce-book-pipelines-settingthevision-2020","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asce\/asce-book-pipelines-settingthevision-2020\/","title":{"rendered":"ASCE Book Pipelines SettingtheVision 2020"},"content":{"rendered":"
Selected papers from Pipelines 2020, held in San Antonio, Texas, August 9\u201312, 2020. Sponsored by the Utility Engineering and Surveying Institute of ASCE.<\/p>\n
This collection contains 48 peer-reviewed papers on the planning and design of pipelines.<\/p>\n
Topics include: asset management; cathodic protection; rehabilitation design; large diameter design; seismic design; and design-build case studies.<\/p>\n
This valuable resource for practitioners and researchers covers the most current state-of-the-art engineering technologies for pipeline and utilities infrastructure and engineering surveying.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | 0001 <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | 0002 <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | 0003 <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | 0004 <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 0005 <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 0006 <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 0007 <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 0008 <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 0009 <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 0010 <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 0011 <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | 0012 <\/td>\n<\/tr>\n | ||||||
77<\/td>\n | 0013 <\/td>\n<\/tr>\n | ||||||
84<\/td>\n | 0014 <\/td>\n<\/tr>\n | ||||||
93<\/td>\n | 0015 <\/td>\n<\/tr>\n | ||||||
102<\/td>\n | 0016 <\/td>\n<\/tr>\n | ||||||
110<\/td>\n | 0017 <\/td>\n<\/tr>\n | ||||||
119<\/td>\n | 0018 <\/td>\n<\/tr>\n | ||||||
129<\/td>\n | 0019 <\/td>\n<\/tr>\n | ||||||
138<\/td>\n | 0020 <\/td>\n<\/tr>\n | ||||||
147<\/td>\n | 0021 <\/td>\n<\/tr>\n | ||||||
156<\/td>\n | 0022 <\/td>\n<\/tr>\n | ||||||
163<\/td>\n | 0023 <\/td>\n<\/tr>\n | ||||||
170<\/td>\n | 0024 <\/td>\n<\/tr>\n | ||||||
184<\/td>\n | 0025 <\/td>\n<\/tr>\n | ||||||
196<\/td>\n | 0026 <\/td>\n<\/tr>\n | ||||||
205<\/td>\n | 0027 <\/td>\n<\/tr>\n | ||||||
215<\/td>\n | 0028 <\/td>\n<\/tr>\n | ||||||
224<\/td>\n | 0029 <\/td>\n<\/tr>\n | ||||||
233<\/td>\n | 0030 <\/td>\n<\/tr>\n | ||||||
241<\/td>\n | 0031 <\/td>\n<\/tr>\n | ||||||
249<\/td>\n | 0032 <\/td>\n<\/tr>\n | ||||||
258<\/td>\n | 0033 <\/td>\n<\/tr>\n | ||||||
268<\/td>\n | 0034 <\/td>\n<\/tr>\n | ||||||
275<\/td>\n | 0035 <\/td>\n<\/tr>\n | ||||||
283<\/td>\n | 0036 <\/td>\n<\/tr>\n | ||||||
292<\/td>\n | 0037 <\/td>\n<\/tr>\n | ||||||
302<\/td>\n | 0038 <\/td>\n<\/tr>\n | ||||||
313<\/td>\n | 0039 <\/td>\n<\/tr>\n | ||||||
321<\/td>\n | 0040 <\/td>\n<\/tr>\n | ||||||
333<\/td>\n | 0041 <\/td>\n<\/tr>\n | ||||||
342<\/td>\n | 0042 <\/td>\n<\/tr>\n | ||||||
351<\/td>\n | 0043 <\/td>\n<\/tr>\n | ||||||
362<\/td>\n | 0044 <\/td>\n<\/tr>\n | ||||||
371<\/td>\n | 0045 <\/td>\n<\/tr>\n | ||||||
380<\/td>\n | 0046 <\/td>\n<\/tr>\n | ||||||
388<\/td>\n | 0047 <\/td>\n<\/tr>\n | ||||||
398<\/td>\n | 0048 <\/td>\n<\/tr>\n | ||||||
409<\/td>\n | 0049 <\/td>\n<\/tr>\n | ||||||
417<\/td>\n | 0050 <\/td>\n<\/tr>\n | ||||||
430<\/td>\n | 0051 <\/td>\n<\/tr>\n | ||||||
440<\/td>\n | 0052 <\/td>\n<\/tr>\n | ||||||
449<\/td>\n | 0053 <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Pipelines 2020 – Planning and Design<\/b><\/p>\n |