BS ISO 11992-1:2019
$142.49
Road vehicles. Interchange of digital information on electrical connections between towing and towed vehicles – Physical and data-link layers
Published By | Publication Date | Number of Pages |
BSI | 2019 | 32 |
This document describes the data link layer (DLL) and physical layer (PHY) for the two CAN-based network interfaces specified in the 11992-series.
The DLL sub-clauses are composed of:
-
DLL protocol entity requirements;
-
DLL device interface requirements; and
-
DLL network system requirements.
Normally, the physical signalling sub-layer is implemented in the CAN protocol controller. The physical medium attachment sub-layer is normally implemented in the CAN transceiver or the System Base Chip (SBC). Optionally, it can comprise also additional protection circuitry. The media-dependent sub-layer comprises the connectors and the cabling.
The physical signalling (PS) sub-clauses are composed of:
-
PS entity requirements;
-
PS device interface requirements; and
-
PS network system requirements.
The physical medium attachment (PMA) sub-clauses are composed of:
-
PMA protocol entity requirements; and
-
PMA device interface requirements.
The physical medium dependent (PMD) sub-clauses are composed of:
-
PMD entity requirements;
-
PMD device interface requirements; and
-
PMD network system requirements.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | National foreword |
6 | Foreword |
7 | Introduction |
11 | 1 Scope 2 Normative references |
12 | 3 Terms and definitions |
14 | 4 Abbreviated terms 5 Data link layer (DLL) 5.1 General 5.2 DLL protocol entity requirements 5.3 DLL device interface requirements |
15 | 6 Physical layer (PHY) 6.1 General 6.2 Physical signalling (PS) requirements 6.2.1 General 6.2.2 PS entity requirements 6.2.3 PS device interface requirements |
16 | 6.3 Physical medium attachment (PMA) requirements 6.3.1 PMA entity requirements |
23 | 6.3.2 PMA device interface requirements |
24 | 6.4 Physical media dependent (PMD) sub-layer requirements 6.4.1 PMD entity requirements 6.4.2 PMD device interface requirements |
26 | 6.5 Network wiring harness system requirements |
29 | Annex A (informative) Implementation examples of the bus failure management |
31 | Bibliography |