Shopping Cart

No products in the cart.

BS 5410-3:2023-TC

$265.80

Tracked Changes. Liquid fuel firing – Installations for liquid fuelled standby generators, furnaces, kilns, ovens and other industrial purposes. Code of practice

Published By Publication Date Number of Pages
BSI 2023 188
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. Weā€™re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
1 compares BS 5410-3:2023
2 TRACKED CHANGES
Text example 1 ā€” indicates added text (in green)
107 Foreword
111 1 Scope
2 Normative references
113 3 Terms and definitions
115 4 Classification of fuels
5 Storage and handling temperatures for liquid fuels
116 Table 1 ā€” Minimum tank, outflow and handling temperatures for liquid fuels
6 Liquid fuel storage tanks and equipment
6.1 Liquid fuel tank construction
Table 2 ā€” Types of liquid fuel storage tank and locations for which they are suitable
117 6.2 Capacity
6.3 Selection of tanks
6.4 Equipment for measurement of contents of liquid fuel storage tanks
119 6.5 Filling and monitoring procedures of liquid fuel storage tanks
6.6 Fill pipes and connections
120 6.7 Vent pipes
6.8 Drainage and de-sludging facility
6.9 Multiple storage tanks with return line connections
121 6.10 Installation of liquid fuel storage tanks
122 6.11 Protection of steel tanks on site
6.12 Heating for liquid fuel storage tanks containing classes E, F, G and H oils and biofuels
124 6.13 Service tanks
125 6.14 Rooftop tanks
6.15 Environmental elements
126 7 Liquid fuel handling systems from storage tank to fuel-using equipment
7.1 General
127 7.2 Fuel supply systems for distillate fuels
128 Figure 1 ā€” Remote fuel transfer system
131 7.3 Materials and construction and erection of liquid fuel pipelines
132 7.4 Testing of the pipework installation
133 7.5 Painting and identification
7.6 Fire valve systems and their installation
134 8 Accommodation for storage and service tanks
8.1 General
135 8.2 Tanks above ground away from or outside buildings (other than over or upon the roof)
8.3 Steel tanks buried in the ground
136 8.4 Tanks within, on or over a building
137 Table 3 ā€” Construction and fire resistance (in h) of tank chamber and generator enclosures and the doors and openings therein in large buildings and places of public entertainment or assembly
138 Table 4 ā€” Construction and fire resistance of tank chamber and generator enclosures and the doors and openings therein in all buildings other than large buildings and places of public entertainment or assembly
139 8.5 Bunds (secondary containment)
140 8.6 Siting of tank chambers within buildings with reference to means of escape and accessibility
8.7 Ventilation of tank chambers
8.8 Automatic fireā€‘extinguishing installations and foam inlets in tank chambers
8.9 Lighting and electrical equipment in tank chambers
141 9 Fuel selection considerations
10 Standby generator sets
10.1 General
142 10.2 Accommodation for bulk storage tanks
Figure 2 ā€” Gravity feed fuel transfer supply system
10.3 Fire protection
143 10.4 Noise levels
10.5 Exhaust emissions
144 10.6 Air cooling system
10.7 Electrical capacity
10.8 Control system
145 Figure 3 ā€” Typical standby generator set control and accessory wiring
10.9 Maintenance
146 10.10 Fuel filtration
11 Control of standby generators
11.1 General
11.2 Temperature and pressure control
147 12 Selection of burners for furnaces
12.1 General
12.2 Choosing liquid fuel burning equipment
148 13 Selection and application of burner types for furnaces
13.1 General
13.2 Maximum and minimum heat input requirements
13.3 Heat release rates per unit volume
13.4 Type and shape of flame
13.5 Configuration of the combustion zone
149 13.6 Combustion air source
150 13.7 Pressure in the combustion zone
13.8 Positioning of burners
151 13.9 Noise level
14 Accommodation for and installation of furnaces
14.1 General
14.2 Fire resistance for furnace accommodation
152 14.3 Automatic fire extinguishing installations and foam inlets
14.4 Access to and means of escape from buildings in which furnaces are located
14.5 Smoke outlets
153 14.6 Lighting
14.7 Plant access
14.8 Ventilation and supply of combustion air
15 Waste gas handling equipment ā€“ Chimneys
155 16 Means of heat recovery from waste gases
16.1 Regenerators
16.2 Recuperators
16.3 Waste heat combustion equipment and economizers
17 Air supply facilities
18 Arrangements of additional ventilation where flammable solvents are evaporated in furnaces (ovens)
156 19 Explosion relief
20 Exhausts
157 21 Commissioning, performance tests and handover
21.1 Commissioning arrangements
21.2 Pre-commissioning procedure
158 21.3 Commissioning procedure
161 21.4 Performance tests
21.5 Handover
162 22 Maintenance
22.1 General
22.2 Supplierā€™s and/or installerā€™s responsibility
22.3 Userā€™s responsibility
163 23 Furnace, kiln and oven operating and maintenance instructions
24 Combustion and safety controls for burners
24.1 General
24.2 Flame monitoring
164 24.3 Failure of ignition
24.4 Failure of electricity supply and voltage variations
24.5 Plant breakdown
24.6 Excess temperature
165 24.7 Change from selected liquid fuel pressure conditions
24.8 High or low liquid fuel temperature change
24.9 Fan failure
24.10 Fire at appliance
24.11 Remote alarms
25 Waste gas removal
25.1 Height of chimneys
166 25.2 Number of chimneys or flues
25.3 Chimney crossā€‘sectional area
25.4 Chimney exit
25.5 Internal surfaces of flues
25.6 Types of construction
167 25.7 Lightning conductors
25.8 Inspection access
25.9 Connecting flues
168 25.10 Dampers, draught control and combustion explosion relief doors
169 25.11 Inducedā€‘draught fans
25.12 Balanced flues
26 Fans (induced draught or recirculation)
27 Ejectors
28 Waste gases cleaning equipment
170 29 Electrical equipment
29.1 General
29.2 Wiring
29.3 Electrical isolation of standby generators
29.4 Electrical enclosures, components and cabling
171 30 Automatic shut-off valves and manually operated isolating valves
31 Process regulated control devices
172 32 Valve actuators
33 Ignition equipment
33.1 Maximum gas heat input
33.2 Types of ignition equipment
173 34 Starting-up, shutting-down and flame monitoring control devices
35 Pressure indicators
36 Temperature indicators
37 Flow meters and flow indicators
174 38 Instrumentation
38.1 Essential instrumentation
38.2 Other instrumentation
39 Proving devices
175 40 Safety control devices
40.1 General
40.2 Liquid fuel handling system
40.3 Housekeeping
40.4 Protection against combustion explosions
176 40.5 Fire precautions
41 Visual supervision facilities
177 42 Hazards from use of air filters in combustion systems
43 Hazards arising from accumulation of unburnt liquid fuel in furnaces
178 Annex A (informative)ā€‚ Types of burners
180 Annex B (normative)ā€‚ Maintenance schedule for standby generators
181 Table B.1 ā€” ā€“ Maintenance schedule for standby generators
185 Bibliography
BS 5410-3:2023-TC
$265.80