ASME B31Q 2006
$98.04
ASME B31Q Pipeline Personnel Qualification
Published By | Publication Date | Number of Pages |
ASME | 2006 | 190 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
4 | TABLE OF CONTENTS |
15 | FOREWORD |
18 | COMMITTEE ROSTER |
22 | 1 INTRODUCTION 1.1 Scope 1.2 Purpose and Objectives |
24 | 2 DEFINITIONS |
26 | 3 REFERENCES |
28 | 4 QUALIFICATION PROGRAM 4.1 Development 4.2 Processes and Procedures 4.2.1 Introduction 4.2.2 Definitions (See Section 2) 4.2.3 Determining Covered Tasks (See Section 5) 4.2.4 Abnormal Operating Conditions (AOCs) (See Section 6) |
29 | 4.2.5 Training (See Section 7) 4.2.6 Evaluations (See Section 8) 4.2.7 Qualifications (See Section 9) 4.2.8 Portability of Evaluations (See Section 10) 4.2.9 Program Effectiveness (See Section 11) |
30 | 4.2.10 Communication of Program Requirements and Change (See Section 12) 4.2.11 Documentation (See Section 13) |
32 | 5 DETERMINING COVERED TASKS 5.1 Introduction 5.2 Processes for Determining Covered Tasks 5.3 SME Covered Task Identification Process 5.3.1 Selecting SMEs |
33 | 5.3.2 Identifying Covered Tasks 5.4 Fault Tree Task Identification Process |
34 | 5.5 Using the Task List in Appendix 5A |
38 | 6 ABNORMAL OPERATING CONDITIONS (AOCS) |
40 | 7 TRAINING 7.1 Responsibility 7.1.1 Employers 7.1.2 Qualification Program 7.2 Identification of the Need for Training an Individual 7.2.1 Determining Training Needs 7.2.2 Situations for Considering Training |
41 | 7.3 Training Materials and Implementation 7.3.1 Training Materials 7.3.2 Training Implementation 7.3.3 Training Tests 7.4 Training Documentation 7.4.1 Documenting Training Needs 7.4.2 Documenting Training |
42 | 8 EVALUATION 8.1 Evaluation Process 8.1.1 Responsibilities 8.1.2 Procedures |
43 | 8.2 Evaluation Material(s) and Criteria 8.2.1 Content Validity 8.2.2 Evaluation Criteria |
44 | 8.2.3 Evaluation Method Selection 8.3 Method-Specific Evaluation Requirements 8.3.1 Written Evaluations 8.3.2 Oral Interview Evaluations |
45 | 8.3.3 Performance Evaluations |
46 | 9 QUALIFICATIONS 9.1 Qualification Requirements 9.1.1 Responsibilities |
47 | 9.1.2 Other Codes or Standards 9.1.3 Qualification Process |
48 | 9.2 Suspension and Revocation of Qualification 9.2.1 Suspension 9.2.2 Reinstatement 9.2.3 Revocation 9.2.4 Additional Qualification |
49 | 9.3 Qualification Requirements for Emergency Response 9.4 Performance of Covered Tasks by Non-Qualified Individuals 9.4.1 Direct and Observe 9.4.2 Span of Control Ratio Development and Maintenance |
50 | 9.5 Subsequent Qualification Interval 9.5.1 Development and Implementation |
51 | 9.5.2 Methods 9.5.3 SME Consensus 9.5.4 Difficulty and Importance Analysis; or Difficulty, Importance and Frequency Analysis 9.5.5 Adoption of Appendix 5A Subsequent Qualification Intervals |
52 | 10 PORTABILITY 10.1 Evaluation Portability Requirements 10.1.1 Section 2 Definitions 10.1.2 Section 3 References and Standards 10.1.3 Section 5 Determining Covered Tasks 10.1.4 Section 6 Abnormal Operating Conditions ( AOCs) 10.1.5 Section 8 Evaluation |
53 | 10.1.6 Section 9 Qualifications 10.1.7 Section 12 Communicating the Qualification Program and Managing Program Changes 10.1.8 Section 13 Documentation Requirements |
54 | 11 PROGRAM EFFECTIVENESS 11.1 General |
56 | 12 COMMUNICATING THE QUALIFICATION PROGRAM AND MANAGING PROGRAM CHANGES 12.1 Communicating the Qualification Program 12.1.1 Program Requirements 12.1.2 Qualified Individuals 12.1.3 Program Responsibilities |
57 | 12.2 Managing Program Changes 12.2.1 Management of Change Process 12.2.2 Conditions for Change |
58 | 12.2.3 Rating the Impact of Changes |
60 | 13 DOCUMENTATION REQUIREMENTS 13.1 Documenting the Qualification Program (Section 4) 13.2 Documenting Communication of the Qualification Program (Section 12) 13.3 Documenting Identification of Covered Tasks (Sections 5, 8, and 9) 13.3.1 Process for Identifying Covered Tasks 13.3.2 Covered Task List 13.3.3 Evaluation Criteria 13.3.4 Evaluation Method 13.3.5 Subsequent Qualification Interval 13.3.6 Span of Control 13.4 Documenting Abnormal Operating Conditions ( AOCs) ( Section 6) 13.5 Documenting Training Needs ( Section 7) |
61 | 13.6 Documenting Training 13.7 Documenting an Individual’s Qualification 13.7.1 Qualified Individual 13.7.2 Covered Task 13.7.3 AOCs 13.7.4 Evaluation Method 13.7.5 Qualification Date 13.7.6 Testing 13.7.7 Evaluator 13.8 Documenting Credentials of an Evaluator ( Section 8) 13.9 Documenting Program Changes ( Section 12) |
62 | 13.10 Documenting Program Effectiveness Appraisals ( Section 11) 13.11 Maintenance of Documents 13.11.1 Formatting 13.11.2 Record Life |
64 | 14 BIBLIOGRAPHY |
66 | NONMANDATORY APPENDIX 5A – INTEGRATED TASK LIST |
67 | Task 0001 Measure Structure- To- Electrolyte Potential Task 0011 Conduct Close Interval Survey Task 0021 Measure Soil Resistivity |
68 | Task 0031 Inspect And Monitor Galvanic Ground Beds/ Anodes Task 0041 Installation And Maintenance of Mechanical Electrical Connections |
69 | Task 0051 Installation of Exothermic Electrical Connections Task 0061 Inspect or Test Cathodic Protection Bonds |
70 | Task 0071 Inspect or Test Cathodic Protection Electrical Isolation Devices Task 0081 Install Cathodic Protection Electrical Isolation Devices Task 0091 Troubleshoot in- Service Cathodic Protection System |
71 | Task 0101 Inspect Rectifier And Obtain Readings Task 0111 Maintain Rectifier |
72 | Task 0121 Collect Sample For Internal Corrosion Monitoring Task 0131 Insert And Remove Coupons/ Probes For Internal Corrosion Monitoring |
73 | Task 0141 Visual Inspection For Atmospheric Corrosion Task 0151 Visual Inspection of Buried Pipe and Components When Exposed Task 0161 Visual Inspection for Internal Corrosion |
74 | Task 0171 Measure External Corrosion Task 0181 Measure Internal Corrosion |
75 | Task 0191 Measure Atmospheric Corrosion Task 0201 Visual Inspection of Installed Pipe and Components for Mechanical Damage |
76 | Task 0211 Measure and Characterize Mechanical Damage on Installed Pipe and Components Task 0221 Inspect, Test and Maintain Sensing Devices |
77 | Task 0231 Inspect, Test and Maintain Programmable Logic Controllers Task 0241 Inspect, Test and Maintain Liquid Leak Detection Flow Computers |
78 | Task 0251 Inspection and Testing, Corrective and Preventive Maintenance – Overfill Protection Systems |
79 | Task 0261 Inspection, Testing, Corrective and Preventive Maintenance – Tank Gauges for Leak Detection Task 0271 Prove Flow Meters for Hazardous Liquid Leak Detection |
80 | Task 0281 Maintain Flow Meters for Hazardous Liquid Leak Detection Task 0291 Inspect, Test and Maintain Gravitometers/ Densitometers for Hazardous Liquid Leak Detection |
81 | Task 0301 Manually Opening and Closing Valves Task 0311 Adjust and Monitor Flow or Pressure – Manual Valve Operation |
82 | Task 0321 Valve Corrective Maintenance |
83 | Task 0331 Valve – Visual Inspection and Partial Operation Task 0341 Valve – Preventive Maintenance |
84 | Task 0351 Pneumatic Actuator/ Operator Inspection and Testing, Preventive and Corrective Maintenance Task 0361 Electric Actuator/ Operator Inspection and Testing, Preventive and Corrective Maintenance |
85 | Task 0371 Hydraulic Actuator/ Operator Inspection and Testing, Preventive and Corrective Maintenance Task 0381 Spring Loaded Pressure Regulating Device – Inspection and Testing, Preventive and Corrective Maintenance |
86 | Task 0391 Pilot – Operated Pressure Regulating Device – Inspection, Testing, Preventive and Corrective Maintenance |
87 | Task 0401 Controller Type Pressure Regulating Device – Inspection, Testing, Preventive and Corrective Maintenance |
88 | Task 0411 Spring – Loaded Pressure Limiting and Relief Device – Inspection, Testing, Preventive and Corrective Maintenance Task 0421 Pilot Operated Pressure Limiting and Relief Device – Inspection, Testing, Preventive and Corrective Maintenance |
89 | Task 0431 Pneumatic Loaded Pressure Limiting and Relief Device – Inspection, Testing, Preventive and Corrective Maintenance |
90 | Task 0441 Compressor Start- Up and Shutdown – Manual Task 0451 Pump – Start- Up and Shutdown – Manual |
91 | Task 0461 Compressor Preventive Maintenance Task 0471 Reciprocating Compressor Inspection, Testing and Corrective Maintenance |
92 | Task 0481 Centrifugal Compressor Inspection, Testing and Corrective Maintenance Task 0491 Rotary Compressor Inspection, Testing and Corrective Maintenance |
93 | Task 0501 Pump Preventive Maintenance Task 0511 Centrifugal Pump Inspection, Testing and Corrective Maintenance |
94 | Task 0521 Reciprocating Pump Inspection, Testing and Corrective Maintenance Task 0531 Rotary Pump Inspection, Testing and Corrective Maintenance |
95 | Task 0541 Screw Pump Inspection, Testing and Corrective Maintenance Task 0551 Explosive Atmosphere Detection and Alarm System Performance Test, and Corrective Maintenance |
96 | Task 0561 Pressure Test – Nonliquid Medium – MAOP Less Than 100 Psi Task 0571 Pressure Test – Nonliquid Medium – MAOP Greater Than or Equal to 100 Psi |
97 | Task 0581 Pressure Test – Liquid Medium Task 0591 Leak Test at Operating Pressure |
98 | Task 0601 NDT – Radiographic Testing Task 0611 NDT – Liquid Penetrant Testing Task 0621 NDT – Magnetic Particle Testing |
99 | Task 0631 NDT – Ultrasonic Testing Task 0641 Visually Inspect Pipe and Components Prior To Installation |
100 | Task 0651 Routine Visual Inspection of Breakout Tanks Task 0661 Inspection of Breakout Tanks Task 0671 Joining of Plastic Pipe – Solvent Cement |
101 | Task 0681 Joining of Plastic Pipe – Stab Fittings Task 0691 Joining of Pipe – Non- Bottom Out Compression Couplings |
102 | Task 0701 Joining of Pipe – Bottom Out Compression Couplings Task 0711 Joining of Pipe – Compression Couplings |
103 | Task 0721 Joining of Pipe – Threaded Joints Task 0731 Joining of Pipe — Flange Assembly |
104 | Task 0741 Joining of Pipe – Brazing or Soldering Task 0751 Joining of Plastic Pipe – Butt Heat Fusion: Manual |
105 | Task 0761 Joining of Plastic Pipe – Butt Heat Fusion: Hydraulic Machine Task 0771 Joining of Plastic Pipe – Sidewall Heat Fusion |
106 | Task 0781 Joining of Plastic Pipe – Electrofusion Task 0791 Joining of Plastic Pipe – Socket Heat Fusion |
107 | Task 0801 Welding Task 0811 Visual Inspection of Welding and Welds |
108 | Task 0821 Tubing & Fitting Installation – Instrument, Control and Sampling Task 0831 Cast – Iron Caulked Bell and Spigot Joints – Installation and Maintenance of Mechanical Leak Clamp( s) |
109 | Task 0841 Cast Iron Joints – Sealing: Encapsulation Task 0851 Internal Sealing – Cast Iron and Ductile Iron |
110 | Task 0861 Installation of Steel Pipe in a Ditch Task 0871 Installation of Steel Pipe in a Bore |
111 | Task 0881 Installation of Steel Pipe Plowing/ Pull- In Task 0891 Field Bending of Steel Pipe |
112 | Task 0901 Installation of Plastic Pipe in a Ditch Task 0911 Installation of Plastic Pipe in a Bore Task 0921 Installation of Plastic Pipe Plowing/ Pull- In |
113 | Task 0931 Installation of Plastic Pipe by Plowing/ Planting Task 0941 Install Tracer Wire |
114 | Task 0951 Installation of Pipe Above Ground Task 0961 Above Ground Supports and Anchors – Inspection, Preventive and Corrective Maintenance |
115 | Task 0971 Installation and Maintenance of Casing Spacers, Vents and Seals Task 0981 Backfilling |
116 | Task 0991 Coating Application and Repair – Brushed or Rolled Task 1001 Coating Application and Repair – Sprayed Task 1011 External Coating Application and Repair – Wrapped |
117 | Task 1021 Apply or Repair Internal Coating Other Than by Brushing, Rolling or Spraying Task 1031 Install or Repair Internal Liner |
118 | Task 1041 Install Mechanical Clamps and Sleeves – Bolted Task 1051 Fit- Up of Weld Type Repair Sleeve |
119 | Task 1061 Install Composite Sleeves Task 1071 Repair of Steel Pipe by Grinding |
120 | Task 1081 Tapping a Pipeline ( Tap Diameter 2 Inch and Less) Task 1091 Tapping a Pipeline ( Tap Diameter Greater Than 2 Inch) |
121 | Task 1101 Tapping a Pipeline With a Built- In Cutter Task 1111 Tapping Cast and Ductile Iron Pipe, and Low Pressure Steel Pipe |
122 | Task 1121 Bagging and Stopping Low Pressure Pipe Task 1131 Stopper ( Stopple) Pipe |
123 | Task 1141 Squeeze Off Plastic Pipe Task 1151 Squeeze Off Steel Pipe |
124 | Task 1161 Installation of Customer Meters and Regulators – Residential and Small Commercial Task 1171 Installing Customer Meters – Large Commercial and Industrial |
125 | Task 1181 Installing and Maintaining Customer Pressure Regulating, Limiting, and Relief Device – Large Commercial & Industrial |
126 | Task 1191 Maintenance of Service Valves Upstream of Customer Meter Task 1201 Temporary Isolation of Service Lines and Service Discontinuance Task 1211 Odorization – Periodic Sampling |
127 | Task 1221 Odorization – Odorizer Inspection, Testing, Preventive and Corrective Maintenance Task 1231 Inside Gas Leak Investigation |
128 | Task 1241 Outside Gas Leak Investigation Task 1251 Hazardous Liquid Leak Investigation |
129 | Task 1261 Walking Gas Leakage Survey Task 1271 Mobile Gas Leakage Survey – Flame Ionization |
130 | Task 1281 Mobile Gas Leakage Survey – Optical Methane Task 1291 Locate Underground Pipelines |
131 | Task 1301 Install and Maintain Pipeline Markers Task 1311 Inspect Pipeline Surface Conditions – Patrol Right of Way or Easement Task 1321 Damage Prevention During Excavation Activities by or on Behalf of The Operator |
132 | Task 1331 Damage Prevention Inspection During Third Party Excavation or Encroachment Activities as Determined Necessary by Operator Task 1341 Provide or Assure Adequate Pipeline Support During Operator Initiated Excavation Activities |
133 | Task 1351 Vault Inspection and Maintenance Task 1361 Station Emergency Shutdown System – Inspection, Testing and Corrective Maintenance |
134 | Task 1371 Operate Gas Pipeline – System Control Center Operations Task 1381 Operate Gas Pipeline – Local Facility Remote- Control Operations |
135 | Task 1391 Operate Liquids Pipeline – System Control Center Operations |
136 | Task 1401 Operate Liquids Pipeline – Local Facility Remote- Control Operations Task 1411 Indirect Inspection Techniques |
137 | Task 1421 Direct Examination Techniques Task 1431 Diving – Measure Structure to Electrolyte Potential Task 1441 Diving – External Coating Application and Repair |
138 | Task 1451 Diving – Visual/ Tactile Inspection for Corrosion and Mechanical Damage – Buried or Submerged Pipeline Task 1461 Diving – Measure and Describe Corrosion and Mechanical Damage – Buried or Submerged Pipeline |
139 | Task 1471 Diving – Install Galvanic Anodes on Submerged Pipelines Task 1481 Diving – Locate Buried Underwater Pipelines |
140 | Task 1491 Diving – Movement of in- Service Underwater Pipeline Task 1501 Diving – Install, Replace or Repair Support Structures on Existing Underwater Pipelines |
141 | Task 1511 Diving – Perform General Flange Assembly Procedures Task 1521 Diving – Install Pipe End Connectors |
142 | Task 1531 Diving – Install Mechanical Clamps or Sleeves Task 1541 Diving – Perform an Underwater Mechanical Tap |
143 | Task 1551 Diving – Stopper ( Stopple) Pipe Task 1561 Diving – Valve – Inspection, Preventive and Corrective Maintenance |
144 | Task 1571 Diving – NDT – Magnetic Particle Testing Task 1581 Diving – NDT – Manipulate Probe for Ultrasonic Testing Task 1591 Diving – NDT – Radiographic Testing |
145 | Task 1601 Diving – Welding Task 1611 Diving – Visual Inspection of Welding and Welds |
146 | Task 1621 Diving – Manually Operate Valves |
148 | NONMANDATORY APPENDIX 5B SUMMARY OF INTEGRATED TASK LIST Task 0001 Measure Structure- to- Electrolyte Potential Task 0011 Conduct Close Interval Survey Task 0021 Measure Soil Resistivity Task 0031 Inspect and Monitor Galvanic Ground Beds/ Anodes Task 0041 Installation and Maintenance of Mechanical Electrical Connections Task 0051 Installation of Exothermic Electrical Connections Task 0061 Inspect or Test Cathodic Protection Bonds Task 0071 Inspect or Test Cathodic Protection Electrical Isolation Devices Task 0081 Install Cathodic Protection Electrical Isolation Devices Task 0091 Troubleshoot In- Service Cathodic Protection System |
149 | Task 0101 Inspect Rectifier and Obtain Readings Task 0111 Maintain Rectifier Task 0121 Collect Sample for Internal Corrosion Monitoring Task 0131 Insert and Remove Coupons/ Probes for Internal Corrosion Monitoring Task 0141 Visual Inspection for Atmospheric Corrosion Task 0151 Visual Inspection of Buried Pipe and Components When Exposed Task 0161 Visual Inspection for Internal Corrosion Task 0171 Measure External Corrosion Task 0181 Measure Internal Corrosion Task 0191 Measure Atmospheric Corrosion |
150 | Task 0201 Visual Inspection of Installed Pipe and Components for Mechanical Damage Task 0211 Measure and Characterize Mechanical Damage on Installed Pipe and Components Task 0221 Inspect, Test and Maintain Sensing Devices Task 0231 Inspect, Test and Maintain Programmable Logic Controllers Task 0241 Inspect, Test and Maintain Liquid Leak Detection Flow Computers Task 0251 Inspection and Testing, Corrective and Preventive Maintenance – Overfill Protection Systems Task 0261 Inspection and Testing, Corrective and Preventive Maintenance – Tank Gauges for Leak Detection |
151 | Task 0271 Prove Flow Meters for Hazardous Liquid Leak Detection Task 0281 Maintain Flow Meters for Hazardous Liquid Leak Detection Task 0291 Inspect, Test and Maintain Gravitometers/ Densitometers for Hazardous Liquid Leak Detection Task 0301 Manually Opening and Closing Valves Task 0311 Adjust and Monitor Flow or Pressure – Manual Valve Operation Task 0321 Valve Corrective Maintenance |
152 | Task 0331 Valve – Visual Inspection and Partial Operation Task 0341 Valve – Preventive Maintenance Task 0351 Pneumatic Actuator/ Operator Inspection and Testing, Preventive and Corrective Maintenance Task 0361 Electric Actuator/ Operator Inspection and Testing, Preventive and Corrective Maintenance Task 0371 Hydraulic Actuator/ Operator Inspection and Testing, Preventive and Corrective Maintenance Task 0381 Spring Loaded Pressure Regulating Device – Inspection and Testing, Preventive and Corrective Maintenance |
153 | Task 0391 Pilot Operated Pressure Regulating Device – Inspection, Testing, Preventive and Corrective Maintenance Task 0401 Controller Type Pressure Regulating Device – Inspection, Testing, Preventive and Corrective Maintenance Task 0411 Spring Loaded Pressure Limiting and Relief Device – Inspection, Testing, Preventive and Corrective Maintenance Task 0421 Pilot Operated Pressure Limiting and Relief Device – Inspection, Testing, Preventive and Corrective Maintenance |
154 | Task 0431 Pneumatic Loaded Pressure Limiting and Relief Device – Inspection, Testing, Preventive and Corrective Maintenance Task 0441 Compressor Start- up and Shutdown – Manual Task 0451 Pump – Start- up and Shutdown – Manual Task 0461 Compressor Preventive Maintenance Task 0471 Reciprocating Compressor Inspection, Testing and Corrective Maintenance Task 0481 Centrifugal Compressor Inspection, Testing and Corrective Maintenance Task 0491 Rotary Compressor Inspection, Testing and Corrective Maintenance |
155 | Task 0501 Pump Preventive Maintenance Task 0511 Centrifugal Pump Inspection and Testing and Corrective Maintenance Task 0521 Reciprocating Pump Inspection and Testing and Corrective Maintenance Task 0531 Rotary Pump Inspection and Testing and Corrective Maintenance Task 0541 Screw Pump Inspection and Testing and Corrective Maintenance Task 0551 Explosive Atmosphere Detection and Alarm System Performance Test, and Corrective Maintenance Task 0561 Pressure Test – Nonliquid Medium – MAOP Less Than 100 psi Task 0571 Pressure Test – Nonliquid Medium – MAOP Greater Than or Equal To 100 psi Task 0581 Pressure Test – Liquid Medium |
156 | Task 0591 Leak Test at Operating Pressure Task 0601 NDT – Radiographic Testing Task 0611 NDT – Liquid Penetrant Testing Task 0621 NDT – Magnetic Particle Testing Task 0631 NDT – Ultrasonic Testing Task 0641 Visually Inspect Pipe and Components Prior to Installation Task 0651 Routine Visual Inspection of Breakout Tanks Task 0661 Inspection of Breakout Tanks Task 0671 Joining of Plastic Pipe – Solvent Cement Task 0681 Joining of Plastic Pipe – Stab Fittings |
157 | Task 0691 Joining of Pipe – Non- Bottom Out Compression Couplings Task 0701 Joining of Pipe – Bottom Out Compression Couplings Task 0711 Joining of Pipe – Compression Couplings Task 0721 Joining of Pipe – Threaded Joints Task 0731 Joining of Pipe – Flange Assembly Task 0741 Joining of Pipe – Brazing or Soldering Task 0751 Joining of Plastic Pipe – Butt Heat- Fusion: Manual Task 0761 Joining of Plastic Pipe – Butt Heat- Fusion: Hydraulic Machine Task 0771 Joining of Plastic Pipe – Sidewall Heat Fusion Task 0781 Joining of Plastic Pipe – Electrofusion |
158 | Task 0791 Joining of Plastic Pipe – Socket Heat Fusion Task 0801 Welding Task 0811 Visual Inspection of Welding and Welds Task 0821 Tubing & Fitting Installation – Instrument, Control and Sampling Task 0831 Cast Iron – Caulked Bell and Spigot Joints – Installation and Maintenance of Mechanical Leak Clamp( s) Task 0841 Cast Iron Joints – Sealing: Encapsulation Task 0851 Internal Sealing – Cast Iron and Ductile Iron Task 0861 Installation of Steel Pipe in a Ditch Task 0871 Installation of Steel Pipe in a Bore Task 0881 Installation of Steel Pipe Plowing/ Pull- in |
159 | Task 0891 Field Bending of Steel Pipe Task 0901 Installation of Plastic Pipe in a Ditch Task 0911 Installation of Plastic Pipe in a Bore Task 0921 Installation of Plastic Pipe Plowing/ Pull- in Task 0931 Installation of Plastic Pipe by Plowing/ Planting Task 0941 Install Tracer Wire Task 0951 Installation of Pipe Above Ground Task 0961 Above Ground Supports and Anchors – Inspection, Preventive and Corrective Maintenance Task 0971 Installation and Maintenance of Casing Spacers, Vents and Seals |
160 | Task 0981 Backfilling Task 0991 Coating Application and Repair – Brushed or Rolled Task 1001 Coating Application and Repair – Sprayed Task 1011 External Coating Application and Repair – Wrapped Task 1021 Apply or Repair Internal Coating other than by Brushing, Rolling or Spraying. Task 1031 Install or Repair Internal Liner Task 1041 Install Mechanical Clamps and Sleeves – Bolted Task 1051 Fit- up of Weld Type Repair Sleeve Task 1061 Install Composite Sleeves Task 1071 Repair of Steel Pipe by Grinding |
161 | Task 1081 Tapping a Pipeline ( Tap Diameter 2 Inch and Less) Task 1091 Tapping a Pipeline ( Tap Diameter greater than 2 Inch) Task 1101 Tapping a Pipeline with a Built- in Cutter Task 1111 Tapping Cast and Ductile Iron Pipe, and Low Pressure Steel Pipe Task 1121 Bagging and Stopping Low Pressure Pipe Task 1131 Stopper ( Stopple) Pipe Task 1141 Squeeze off Plastic Pipe Task 1151 Squeeze off Steel Pipe |
162 | Task 1161 Installation of Customer Meters and Regulators – Residential and Small Commercial Task 1171 Installing Customer Meters – Large Commercial and Industrial Task 1181 Installing and Maintaining Customer Pressure Regulating, Limiting, and Relief Device – Large Commercial & Industrial Task 1191 Maintenance of Service Valves Upstream of Customer Meter Task 1201 Temporary Isolation of Service Lines and Service Discontinuance Task 1211 Odorization – Periodic Sampling Task 1221 Odorization – Odorizer Inspection, Testing, Preventive and Corrective Maintenance |
163 | Task 1231 Inside Gas Leak Investigation Task 1241 Outside Gas Leak Investigation Task 1251 Hazardous Liquid Leak Investigation Task 1261 Walking Gas Leakage Survey Task 1271 Mobile Gas Leakage Survey – Flame Ionization Task 1281 Mobile Gas Leakage Survey – Optical Methane Task 1291 Locate Underground Pipelines Task 1301 Install and Maintain Pipeline Markers Task 1311 Inspect Pipeline Surface Conditions – Patrol Right of Way or Easement |
164 | Task 1321 Damage Prevention during Excavation Activities By or On Behalf of the Operator Task 1331 Damage Prevention Inspection during Third Party Excavation or Encroachment Activities as Determined Necessary by Operator Task 1341 Provide or Assure Adequate Pipeline Support During Operator Intiated Excavation Activities Task 1351 Vault Inspection and Maintenance Task 1361 Station Emergency Shutdown System – Inspection, Testing and Corrective Maintenance Task 1371 Operate Gas Pipeline – System Control Center Operations |
165 | Task 1381 Operate Gas Pipeline – Local Facility Remote- Control Operations Task 1391 Operate Liquids Pipeline – System Control Center Operations Task 1401 Operate Liquids Pipeline – Local Facility Remote- Control Operations Task 1411 Indirect Inspection Techniques Task 1421 Direct Examination Techniques Task 1431 Diving – Measure Structure to Electrolyte Potential Task 1441 Diving – External Coating Application and Repair Task 1451 Diving – Visual/ Tactile Inspection for Corrosion and Mechanical Damage – Buried or Submerged Pipeline Task 1461 Diving – Measure and Describe Corrosion and Mechanical Damage – Buried or Submerged Pipeline Task 1471 Diving – Install Galvanic Anodes on Submerged Pipelines |
166 | Task 1481 Diving – Locate Buried Underwater Pipelines Task 1491 Diving – Movement of In- Service Underwater Pipeline Task 1501 Diving – Install, Replace or Repair Support Structures on Existing Underwater Pipelines Task 1511 Diving – Perform General Flange Assembly Procedures Task 1521 Diving – Install Pipe End Connectors Task 1531 Diving – Install Mechanical Clamps or Sleeves Task 1541 Diving – Perform an Underwater Mechanical Tap Task 1551 Diving – Stopper ( Stopple) Pipe Task 1561 Diving – Valve – Inspection, Preventive and Corrective Maintenance Task 1571 Diving – NDT – Magnetic Particle Testing |
167 | Task 1581 Diving – NDT – Manipulate Probe for Ultrasonic Testing Task 1591 Diving – NDT – Radiographic Testing Task 1601 Diving – Welding Task 1611 Diving – Visual Inspection of Welding and Welds Task 1621 Diving – Manually Operate Valves |
168 | NONMANDATORY APPENDIX 5C TASK LIST DEVELOPMENT PROCESS |
170 | NONMANDATORY APPENDIX 5D EXAMPLE OF EVALUATION CRITERIA |
172 | NONMANDATORY APPENDIX 6A ABNORMAL OPERATING CONDITIONS ( AOCS) |
174 | NONMANDATORY APPENDIX 8A EVALUATION METHOD SELECTION 8A-1 Introduction — The Reason for Setting an Appropriate Evaluation Method 8A-2 Definition And Examples of KSAs |
175 | 8A-3 Appropriate Methods for KSAs 8A-3.1 Written evaluations 8A-3.2 Oral Interview evaluations 8A-3.3 Performance evaluations |
176 | 8A-4 Consensus on Minimum Appropriate Evaluation Method |
177 | 8A-5 Review of Final Product |
178 | NONMANDATORY APPENDIX 9A DIF ANALYSIS FOR SUBSEQUENT QUALIFICATION INTERVALS 9A- 1 Introduction 9A-2 The DIF Analysis Process 9A-3 SME Representation 9A-3.1 Consensus Group Representation 9A-3.2 Survey Sample Size |
181 | 9A-4 DIF Rating Scales 9A-4.1 Difficulty |
182 | 9A-4.2 Importance |
183 | 9A-4.3 Frequency 9A-5 Specific Application of DIF Analysis to Determine Subsequent Qualification Intervals |
184 | 9A-5.1 Use of the DIF Ratings and Decision Tree to Determine Subsequent Qualification Intervals |
187 | 9A-5.2 Sample Decision Tree Application |
188 | NONMANDATORY APPENDIX 11A PROGRAM IMPLEMENTATION AND EFFECTIVENESS APPRAISALS 11A-1 Program Implementation Appraisal |
189 | 11A- 2 Program Effectiveness Appraisal |