ASCE 9780784409879 2008
$27.08
Preparing Requests for Proposals and Specifications for Design-Build Projects
Published By | Publication Date | Number of Pages |
ASCE | 2008 | 53 |
This report explains in detail the key steps in writing a request for proposal (RFP) or specifications document for construction projects using design-build as the project delivery method.
PDF Catalog
PDF Pages | PDF Title |
---|---|
6 | Contents |
8 | 1.0 Introduction 1.1 General Purpose and Goals |
10 | 2.0 Design-Build Contract Complexities 2.1 Introduction 2.2 Owner’s Objectives and Critical Capabilities 2.3 Design-Build Project Organization Approaches |
14 | 2.4 Project Sequence and Scheduling Options |
15 | 2.5 Project Ownership and Operation 2.6 Design-Build Compensation Options |
17 | 2.7 Constructor Design Input 2.8 Project Types Less Suitable for Design-Build |
18 | 3.0 Project Definition and Conceptual Design 3.1 Introduction 3.2 Acquiring a Conceptual Design |
19 | 3.3 Articulating Owner’s Values and Expectations |
21 | 3.4 Scope of Work |
22 | 4.0 Preparing the Request for Proposals 4.1 Introduction 4.2 Selection Criteria |
23 | 4.3 Qualifications |
24 | 4.4 Technical Considerations |
26 | 4.5 Cost Considerations |
28 | 5.0 General Terms and Conditions 5.1 Introduction 5.2 Project Schedule Objectives 5.3 Pursuit of Optimal Project Schedule 5.4 Unusual Scope Inclusions |
29 | 5.5 Change Management Program 5.6 Design Documentation 5.7 Pursuit of Enhanced Project Constructability 5.8 Application of Value Engineering Studies |
30 | 5.9 Pursuit of Life-Cycle Cost Economy 5.10 Value Engineering Change Proposals 5.11 Examples of Contract Provisions |
38 | 6.0 Specifications for Design-Build Projects 6.1 Introduction 6.2 Owner-Generated Specifications |
39 | 6.3 Contractor-Generated Specifications |
40 | Appendix 1 Sample Request for Proposal Technical Criteria |
46 | Appendix 2 Sample Design-Build Performance Specification |
52 | Index C D E G J O P Q R |
53 | S T U V |