ASCE 9780784404294 2000
$30.33
Diatomaceous Earth Filtration for Safe Drinking Water
Published By | Publication Date | Number of Pages |
ASCE | 2000 | 225 |
George Fulton offers complete coverage of diatomaceous earth (DE) filtration as applied to the treatment of drinking water, especially from low-turbidity sources of water supply.
PDF Catalog
PDF Pages | PDF Title |
---|---|
4 | Contents |
6 | Preface |
10 | Acknowledgments |
12 | 1 Introduction |
13 | DlATOMACEOUS EARTH MEDIA |
14 | APPLICATION AND HISTORICAL BACKGROUND |
17 | POROUS MEDIA FILTERS |
24 | THE DIATOMACEOUS EARTH FILTER AND PERTINENT REGULATIONS |
34 | MULTIPLE DESIGN/OPERATION OPTIONS |
38 | PRELIMINARY RESEARCH |
40 | 2 Diatomaceous Earth Filter Types and Options GENERAL |
42 | INITIAL FILTER DESIGNS |
46 | HYDRAULIC MODES OF OPERATION |
50 | CONTAINMENTS |
52 | FILTER LEAF ASSEMBLY |
59 | BAFFLED INLETS |
61 | OUTLET MANIFOLDS SLUICING SPRAYS |
62 | PRESSURE FILTER OPTIONS |
67 | VACUUM FILTER OPTIONS |
70 | 3 Principal Performance Features PRINCIPAL PARTICULATE FEATURES |
73 | HEAD LOSS AND BODY FEED |
78 | ENHANCED SOLIDS REMOVAL |
82 | BREAKTHROUGH POTENTIAL |
84 | COLOR REMOVAL |
85 | IRON AND MANGANESE |
91 | DISINFECTION BYPRODUCTS |
96 | 4 Filter and Ancillary Systems |
97 | BASIC PRESSURE FILTER SYSTEM |
101 | BASIC VACUUM FILTER SYSTEM |
105 | MULTIPLE FILTER ARRANGEMENTS |
108 | DELIVERY AND STORAGE OF DRY DIATOMACEOUS EARTH |
113 | DIATOMACEOUS EARTH SLURRY STORAGE AND TRANSFER |
117 | DIATOMACEOUS EARTH RECOVERY AND RECYCLE |
119 | WASTE DISPOSAL |
124 | 5 PilotTesting SIMULATION |
126 | PROCESS VARIABLES |
132 | PILOT PROGRAM DESIGN |
136 | BUCHNER FUNNEL TEST |
142 | FUNDAMENTAL PILOT FILTER TESTS |
147 | SQUARE FOOT PRESSURE FILTER |
157 | PILOT VACUUM FILTER |
158 | SUPPLEMENTARY TREATMENT TEST DATA |
163 | PRINCIPAL PROCEDURE CONSIDERATIONS |
167 | PILOT OPERATION—TROUBLESHOOTING |
172 | 6 Equipment and Materials of Construction: Principal Safety and Design Features INFLUENCING FACTORS |
174 | SYSTEM HYDRAULICS |
175 | WATER SUPPLY PUMPS |
179 | SLURRY HANDLING |
184 | INSTRUMENTATION AND CONTROLS |
188 | 7 Design and Operation POTENTIAL APPLICATIONS |
191 | DESIGN PROCEDURES |
198 | PRELIMINARY ENGINEERING |
217 | CONTRACT DOCUMENTS: CONSTRUCTION |
218 | START-UP/TROUBLESHOOTING OPERATION |
221 | References |
222 | Index A B C D |
223 | E F G H I L M |
224 | O P R S |
225 | T V W |