{"id":89939,"date":"2024-10-18T07:17:39","date_gmt":"2024-10-18T07:17:39","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asce-9780784477823-2013\/"},"modified":"2024-10-24T20:25:09","modified_gmt":"2024-10-24T20:25:09","slug":"asce-9780784477823-2013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asce\/asce-9780784477823-2013\/","title":{"rendered":"ASCE 9780784477823 2013"},"content":{"rendered":"

Proceedings of the 14th International Conference on Automated People Movers and Automated Transit Systems, held April 21<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nCover <\/td>\n<\/tr>\n
10<\/td>\nContents <\/td>\n<\/tr>\n
16<\/td>\nAirports
APMs and Airport Mobility\u2014Historic Trends and Future Possibilities <\/td>\n<\/tr>\n
29<\/td>\nAirport APMs\u2014History and Future <\/td>\n<\/tr>\n
53<\/td>\nPlanning Partnership: Support for the PHX Sky Train <\/td>\n<\/tr>\n
71<\/td>\nPhoenix Sky Harbor International Airport: PHX Sky Train\u2014Making Tracks in the Arizona Desert <\/td>\n<\/tr>\n
83<\/td>\nChicago O\u2019Hare Airport Transit System: Sustainable Ground Transportation <\/td>\n<\/tr>\n
96<\/td>\nThe Sacramento International Airport APM\u2014Takeaways from the Early Under-Budget Big Build <\/td>\n<\/tr>\n
106<\/td>\nDelivering an APM to the Sacramento County International Airport <\/td>\n<\/tr>\n
117<\/td>\nSeattle Tacoma International Airport STS: APM and Airport Growing Together <\/td>\n<\/tr>\n
128<\/td>\nMaintaining Reliable Service While Expanding the World\u2019s Busiest Airports <\/td>\n<\/tr>\n
142<\/td>\nEvaluation of Passenger Satisfaction with the Heathrow PRT System <\/td>\n<\/tr>\n
158<\/td>\nMajor Activity Centers and Urban Systems
Mirage\/Treasure Island Automated People Mover: Safe Operations for 19+ Years <\/td>\n<\/tr>\n
166<\/td>\nAerial Transit Link\u2014New York City <\/td>\n<\/tr>\n
188<\/td>\nAPM History in Canada <\/td>\n<\/tr>\n
197<\/td>\nAutomated Light Metro for Honolulu <\/td>\n<\/tr>\n
219<\/td>\nAutomated Systems for Last Mile Connections at High-Speed Rail Stations <\/td>\n<\/tr>\n
232<\/td>\nCable Propelled Transit Systems\u2014Emirates Air Line London <\/td>\n<\/tr>\n
237<\/td>\nEvolving Clark County Amusement and Transportation System (ATS) Code Requirements <\/td>\n<\/tr>\n
245<\/td>\nA Modern Mobility Solution for Urban Transit with the Latest Generation of the INNOVIA System <\/td>\n<\/tr>\n
262<\/td>\nPersonal Rapid Transit
Personal Rapid Transit User Interface <\/td>\n<\/tr>\n
278<\/td>\nThe Track to Suncheon: Making APMs Intelligent <\/td>\n<\/tr>\n
291<\/td>\nPersonal Rapid Transit\u2014Computer Simulation Results and General Design Principles <\/td>\n<\/tr>\n
311<\/td>\nPRT (Personal Rapid Transit) Computer Network Simulation and Analysis of Flow Capacity <\/td>\n<\/tr>\n
328<\/td>\nPlanning
APM and Other Driverless Systems for Integrated Urban Planning and Sustainability <\/td>\n<\/tr>\n
341<\/td>\nCalculating the Capacity of Automated Transit Network Systems <\/td>\n<\/tr>\n
351<\/td>\nSimplifying the Measure of Service Availability <\/td>\n<\/tr>\n
359<\/td>\nAlternative Project Delivery Strategies <\/td>\n<\/tr>\n
371<\/td>\nBART OAC Project: Application of Buy America to a Cable-Propelled System <\/td>\n<\/tr>\n
379<\/td>\nMODSAFE\u2014A Detailed Safety Model for Urban Guided Transport Systems <\/td>\n<\/tr>\n
390<\/td>\nImproving Airport People Mover Performance with an Intelligent Onboard CCTV System <\/td>\n<\/tr>\n
400<\/td>\nSystem Components
50 Years of Powering APMs: A Historical Perspective of Variables and Constants in Power Rail Design <\/td>\n<\/tr>\n
419<\/td>\nEnergy Optimization for Public Transportation Applications <\/td>\n<\/tr>\n
440<\/td>\nEnergy Management Solutions for \u201cGreen\u201d\u009d Transit Systems
Advances in Voice over IP and Passenger Information for APM Systems: Utilizing Wireless Networks <\/td>\n<\/tr>\n
448<\/td>\nFriction Stir Welding APM Vehicle Body Structures: INNOVIA APM 300 Case Study <\/td>\n<\/tr>\n
458<\/td>\nApplication of ASTM E 119 Testing Requirements to APM Vehicles: INNOVIA APM 300 Case Study <\/td>\n<\/tr>\n
466<\/td>\nNew \u201cAC\/AC\u201d\u009d Propulsion System for the INNOVIA APM 300 <\/td>\n<\/tr>\n
476<\/td>\nChallenges with System Integration <\/td>\n<\/tr>\n
484<\/td>\nEvolution of a New Generation of Automated Transit Systems\u2014INNOVIA APM 300 <\/td>\n<\/tr>\n
496<\/td>\nTrain Control Upgrade for the Morgantown Person Rapid Transit System at West Virginia University <\/td>\n<\/tr>\n
508<\/td>\nCommunications-Based Train Control Interoperability Developments at New York City Transit <\/td>\n<\/tr>\n
518<\/td>\nService Improvements to the Toronto (GTAA) Pearson Airport Link System <\/td>\n<\/tr>\n
526<\/td>\nFirst Results of Paris Metro Line 1 Automation <\/td>\n<\/tr>\n
531<\/td>\nFacilities
The 360 Degree Approach for an APM Infrastructure: Involving the Supplier in Every Step <\/td>\n<\/tr>\n
544<\/td>\nPHX Sky Train Facilities\u2014Tailor-Made for the Airport and Local Community <\/td>\n<\/tr>\n
565<\/td>\nDevelopment of the PHX Sky Train Guideway Alignment <\/td>\n<\/tr>\n
579<\/td>\nPHX Sky Train Means and Methods <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Automated People Movers and Transit Systems 2013<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASCE<\/b><\/a><\/td>\n2013<\/td>\n603<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":89940,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2660],"product_tag":[],"class_list":{"0":"post-89939","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-asce","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/89939","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/89940"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=89939"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=89939"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=89939"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}