{"id":287176,"date":"2024-10-19T19:27:45","date_gmt":"2024-10-19T19:27:45","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iso-tr-16730-52013\/"},"modified":"2024-10-25T16:21:26","modified_gmt":"2024-10-25T16:21:26","slug":"bsi-pd-iso-tr-16730-52013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iso-tr-16730-52013\/","title":{"rendered":"BSI PD ISO\/TR 16730-5:2013"},"content":{"rendered":"
ISO 16730-1 describes what the contents of a technical documentation and of a user\u2019s manual should be for an assessment, if the application of a calculation method as engineering tool to predict real-world scenarios leads to validate results. The purpose of this part of ISO 16730 is to show how ISO 16730-1 is applied to a calculation method, for a specific example. It demonstrates how technical and users\u2019 aspects of the method are properly described in order to enable the assessment of the method in view of verification and validation.<\/p>\n
The example in this part of ISO 16730 describes the application of procedures given in ISO 16730-1 for an evacuation model (EXIT89).<\/p>\n
The main objective of the specific model treated in this part of ISO 16730 is the simulation of the evacuation of a high-rise building with a large occupant population.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
6<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Disclaimer <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Section sec_1 Section sec_2 Section sec_3 1\tScope 2\tNormative references 3\tGeneral information on the evacuation model considered <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Section sec_4 4\tMethodology used in this part of ISO\u00a016730 <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Annex sec_A Annex sec_A.1 Annex\u00a0A \n(informative)<\/p>\n Description of the calculation method <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Annex sec_A.2 <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | Annex sec_A.3 <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | Annex sec_A.4 <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Annex sec_B Annex\u00a0B \n(informative)<\/p>\n Complete description of the assessment (verification and validation) of the calculation method <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Annex sec_C Annex sec_C.1 Annex sec_C.2 Annex sec_C.3 Annex\u00a0C \n(informative)<\/p>\n Worked example (modelling contra flows during building evacuations) <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | Annex sec_C.4 <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | Annex sec_C.5 Annex sec_C.5.1 Annex sec_C.5.2 <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Annex sec_C.5.3 <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | Annex sec_C.5.4 <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | Table tab_C.1 <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | Table tab_C.2 Annex sec_C.6 <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | Figure fig_C.1 <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Annex sec_D Annex sec_D.1 Annex sec_D.2 Annex sec_D.2.1 Annex\u00a0D \n(informative)<\/p>\n User\u2019s manual <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Annex sec_D.2.2 <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Annex sec_D.2.3 Annex sec_D.2.4 <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Annex sec_D.2.5 Annex sec_D.2.6 <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Annex sec_D.2.7 Annex sec_D.2.8 <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | Annex sec_D.3 Annex sec_D.3.1 <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | Annex sec_D.3.2 <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | Annex sec_D.3.3 Annex sec_D.3.4 Annex sec_D.3.5 Annex sec_D.4 <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | Annex sec_D.5 <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Annex sec_D.6 <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | Annex sec_D.7 Table tab_w Figure fig_D.1 <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | Table tab_x Figure fig_D.2 <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Table tab_y Figure fig_D.3 <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | Table tab_z Figure fig_D.4 <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | Table tab_aa Figure fig_D.5 <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | Table tab_ab Figure fig_D.6 <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | Reference ref_1 Reference ref_2 Reference ref_3 Reference ref_4 Reference ref_5 Reference ref_6 Reference ref_7 Reference ref_8 Reference ref_9 Reference ref_10 Reference ref_11 Reference ref_12 Reference ref_13 Reference ref_14 Reference ref_15 Bibliography <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | Reference ref_16 Reference ref_17 Reference ref_18 Reference ref_19 Reference ref_20 Reference ref_21 <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Fire safety engineering. Assessment, verification and validation of calculation methods – Example of an Egress model<\/b><\/p>\n |