{"id":111044,"date":"2024-10-18T16:04:59","date_gmt":"2024-10-18T16:04:59","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1240-2000\/"},"modified":"2024-10-24T22:00:05","modified_gmt":"2024-10-24T22:00:05","slug":"ieee-1240-2000","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1240-2000\/","title":{"rendered":"IEEE 1240 2000"},"content":{"rendered":"
New IEEE Standard – Active. Reaffirmed March 2012. This guide is intended to serve high-voltage direct current (HVDC) converter station reliability by suggesting significant objectives, design, operation, monitoring, and specification details. This guide includes the CIGRE performance protocol and reliability-related mathematical concepts.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Title Page <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Introduction Participants <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 1. Overview 1.1 Scope 1.2 Purpose 2. References <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 3. Definitions <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 4. RAM objectives 4.1 The role of human reliability <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 4.2 Energy availability 4.3 Putting together a total RAM package <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4.4 The ultimate RAM goal 5. Design and documentation 5.1 General design principles <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 5.2 More detailed design principles <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5.3 Software design principles <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5.4 Operation and maintenance manuals <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.5 RAM records 6. Operation 6.1 Training <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 6.2 Maintenance programs affecting reliability <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 6.3 Spare parts <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 7. RAM performance monitoring <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 7.1 Monitoring and evaluation periods 7.2 Monitoring procedures <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 7.3 Evaluation procedures <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 8. Considerations for RAM specifications 8.1 HVDC converter stations located at remote generating stations <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 8.2 Back-to-back HVDC converter stations 8.3 Parameters to consider for energy availability and reliability <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 8.4 Contract administration for energy availability and reliability <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Annex A (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Annex B (informative) CIGR\u00c9\u2019s \u201cProtocol for Reporting the Operational Performance of HVDC Transmission Systems\u201d\u009d <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | Annex C (informative CIGR\u00c9\u2019s \u201cProtocol for Reporting the Operational Performance of HVDC Transmission Systems\u201d\u009d\u2014An example <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | Annex D (informative) CIGR\u00c9\u2019s \u201cProtocol for Reporting the Operational Performance of HVDC Transmission Systems\u201d\u009d\u2014Fault clas <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | Annex E (informative) CIGR\u00c9\u2019s \u201cProtocol for Reporting the Operational Performance of HVDC Transmission Systems\u201d\u009d\u2014Tables <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | Annex F (informative) Foundations for RAM calculations <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for the Evaluation of the Reliability of HVDC Converter Stations<\/b><\/p>\n |