Shopping Cart

No products in the cart.

WRC volume 40 No. 11-12:1985

$27.95

Progress Reports Volume 40 No. 11-12

Published By Publication Date Number of Pages
WRC 1985 106
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

Contents

– Executive and Main Committee & Attachments, October 9, 1985
– PVRC Steering Committee on Piping Systems, October 7, 1985
– Technical Committee on Piping Systems & Attachment, October 7, 1985
– Materials Division, October 9, 1985
– Subcommittee on Failure Modes in Pressure Vessel Materials, October 8, 1985
– Subcommittee on Nondestructive Examination of Pressure Components, October 8, 1985
– Subcommittee on Pressure Vessel Steels, October 8, 1985
– Design Division, October 9, 1985
– Subcommittee on Shells and Ligaments, October 8, 1985
– Subcommittee on Dynamic Analysis of Pressure Vessel Components, October 8, 1985
– Task Group on Dynamic Stress Criteria, October 8, 1985
– Subcommittee on Reinforced Openings and External Loadings, October 7, 1985
– Subcommittee on Elevated Temperature Design & Attachments, October 9, 1985
– Joint Task Group on Elevated Temperature Behavior of Bolted Flanges, October 8, 1985
– Subcommittee on Bolted Flanted Connections, October 9, 1985
– Task Group on Gasket Testing, October 8, 1985
– Subcommittee on Piping, Pumps and Valves, October 9, 1985
– Fabrication Division, October 8, 1985
– PVRC Subcommittee on Weld Metals and Welding Procedures, October 8, 1985
– Subcommittee on Thermal and Mechanical Effects, October 7, 1985
– Subcommittee on Cyclic and Creep Behavior of Component, October 7, 1985
– Subcommittee on Significance of Weld Discontinuities, October 7, 1985
– PVRC Future Meeting Dates

WRC volume 40 No. 11-12:1985
$27.95