Shopping Cart

No products in the cart.

NACE SP0207-2007

$23.40

Performing Close-Interval Potential Surveys and DC Surface Potential Gradient Surveys on Buried or Submerged Metallic Pipelines

Published By Publication Date Number of Pages
NACE 2007-03-10 51
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. Weā€™re here to assist you 24/7.
Email:[email protected]

Full Description

This standard practice presents procedures for performing close-interval direct current (DC) structure-to-electrolyte potential surveys, DC surface potential gradient surveys, and hybrid surveys such as trailing-wire direct current voltage gradient (DCVG) surveys or intensive measurement surveys, on buried or submerged metallic pipelines. This standard is maintained by Task Group 279.

NACE SP0207-2007
$23.40