BS EN 60749-43:2017
$167.15
Semiconductor devices – Mechanical and climatic test methods – Guidelines for IC reliability qualification plans
Published By | Publication Date | Number of Pages |
BSI | 2017 | 44 |
IEC 60749-43:2017 gives guidelines for reliability qualification plans of semiconductor integrated circuit products (ICs). This document is not intended for military- and space-related applications.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
7 | English CONTENTS |
9 | FOREWORD |
11 | INTRODUCTION |
12 | 1 Scope 2 Normative references |
13 | 3 Terms and definitions 4 Product categories and applications |
14 | 5 Failure 5.1 Failure distribution Tables Table 1 ā Examples of product categories |
15 | 5.2 Early failure 5.2.1 Description Figures Figure 1 ā Bathtub curve |
16 | 5.2.2 Early failure rate Figure 2 ā Failure process of IC manufacturing lots during the early failure period |
17 | Figure 3 ā Weibull conceptual diagram of the early failure rate |
19 | 5.2.3 Screening Figure 4 ā Example of a failure ratio: Ī± (in hundreds) and the number of failures for CL of 60 % |
20 | Figure 5 ā Screening and estimated early fail rate in Weibull diagram |
21 | Figure 6 ā Bathtub curve setting the point immediately after production as the origin |
22 | 5.3 Random failure 5.3.1 Description 5.3.2 Mean failure rate Figure 7 ā Bathtub curve setting the point after screening as the origin |
23 | Figure 8 ā Conceptual diagram of calculation method for the mean failure rate from the exponential distribution |
24 | Figure 9 ā Conceptual diagram of calculation method for the mean failure rate as an extension of early failure |
25 | 5.4 Wear-out failure 5.4.1 Description 5.4.2 Wear-out failure rate |
26 | Figure 10 ā Conceptual diagram of the wear-out failure Figure 11 ā Conceptual diagram describing the concept of the acceleration test |
28 | 6 Reliability test 6.1 Reliability test description 6.2 Reliability test plan 6.2.1 Procedures for creating a reliability test plan |
30 | Figure 12 ā Concept of the reliability test in a Weibull diagram (based on sample size) Table 2 ā Cumulative failure probability 0,1 % over 10 years [Ć10ā6] for the third, fifth and seventh years |
31 | 6.2.2 Estimation of the test time required to confirm the TDDB from the number of test samples |
32 | 6.2.3 Estimation of the number of samples required to confirm the TDDB from the test time |
33 | 6.3 Reliability test methods Figure 13 ā Concept of the reliability test in a Weibull diagram (based on test time) |
34 | Figure 14 ā Difference in sampling sizes according tothe m value (image) |
35 | Table 3 ā Major reliability (life) test methods and purposes |
36 | 6.4 Acceleration models for reliability tests 6.4.1 Arrhenius model Table 4 ā Examples of the number of test samples and the test time in typical reliability (life) test methods |
37 | 6.4.2 V-model: 6.4.3 Absolute water vapor pressure model 6.4.4 Coffin-Manson model 7 Stress test methods |
38 | 8 Supplementary tests Table 5 ā LTPD sampling table for acceptance number Ac = 0 Table 6 ā Major reliability (strength) test methods and purposes |
39 | 9 Summary table of assumptions Table 7 ā Supplementary tests |
40 | Table 8 ā Accelerating factors, calculation formulae and numerical valuesa |
41 | 10 Summary |
42 | Bibliography |